Inspection Checklist

Home Inspection Checklist Free

Home Inspection Checklist – Exterior

  • Streets and alleyways cleaned
  • Mailbox completed and flag installed
  • Sidewalks and driveways cleaned – No cracks, no stains, no mortar – Pressurewashed
  • Water meter installed
  • Gate valves and sewer clean-outs located and exposed – at grade.
  • Sod, landscaping, and trees are all fresh and alive. Trees are staked properly.
  • Visually confirm proper positive drainage away from home.
  • French drains at proper grade level and free of debris.
  • Hose bibs and pipe clean outs are installed properly and even with brick.
  • Shutters (painted / stained) and installed per plan/contract.
  • And exterior flood lights are installed properly, pointing correctly, and work.
  • Windows are properly caulked, clean, and have no stress cracks. Screens are installed properly.
  • Brick is cleaned, weep holes are installed, mortar is pointed up. No nails or strings left in brick. Poly cut from slab edge.
  • All expansion joints are installed and caulked properly.
  • Gutters with downspouts are connected to drains and covers. Splash blocks installed if needed.
  • Any exposed gas line going into house is painted.
  • Freon line boxes are installed flush with brick.
  • Phone and tech lines installed through brick
  • Cornice work complete
  • Shingles are clean, roof inspected (fish eyes, high staples, broke shingles)
  • Heater vent pipes are straight and have caps and are taped.
  • Plumbing vent pipes are painted and caps cut off.
  • Fence is at proper height above sod and gates work properly.
  • Sprinkler system is properly labeled and works properly. Heads are straight. None are broken.
  • Confirm that the garage door is not dented. Opener is in place and it operates properly.
  • Doors are weather-stripped and seal properly when closed.
  • Counter flashing looks good and is installed properly. Joints are sealed and painted.
  • Patios are cleaned.
  • Expansion joints used at concrete touching home, exposed expansion material cut off.
  • Exterior outlets installed, GFCI works, cover installed
  • Paint is complete, touchups finished
  • Windows cleaned properly, no stress cracks
  • Brick lintels are painted to prevent rusting. Weep holes above windows.
  • Front door is painted/stained.
  • Peephole installed if required.
  • Doorbell functions and is secured to brick.